FINISHED BASEMENT

Any required Zoning Permits or Drainage Permits must be obtained prior to the start of work

  • The submitted floor plan shall include, but not limited to, the following:
    • Entire area of the basement.
    • Rooms labeled by use.
    • Existing features located, such as doors, windows, and stairs.
    • Cross section detail of walls to be constructed.
    • Smoke and carbon monoxide detector locations.
    • Type, thickness, and R-factor of insulation.
    • Emergency escape and/or second means of egress.
    • For any structural work, plans shall be signed and sealed by an Architect or Engineer licensed in the Commonwealth of Pennsylvania.
  • Submit two (2) copies of the electrical wiring diagram approved by one of the Approved Electrical Underwriters attached to this Application.
  • Submit two (2) copies of the plumbing system showing the size of all drains, vents, traps and materials.  If an ejector sump with pump is to be used, then also submit the manufacture’s specifications.
  • Submit two (2) copies of the mechanical system showing the heating and cooling system.  If using the existing heating and cooling equipment, then provide calculations to prove it is large enough to heat and cool the entire dwelling.  If adding a new system, then provide the location of the new equipment and duct work and provide calculations to prove it is large enough to heat and/or cool the finished area.

Show All Answers

1. ADDITIONS, ALTERATIONS, NEW CONSTRUCTION (RESIDENTIAL)
2. DECK CONSTRUCTION (RESIDENTIAL)
3. DEMOLITION
4. FINISHED BASEMENT
5. GEOTHERMAL SYSTEM INSTALLATION
6. SOLAR PANEL INSTALLATION
7. STANDBY GENERATOR
8. SWIMMING POOL CONSTRUCTION