SOLAR PANEL INSTALLATION

Any required Zoning Permits or Drainage Permits must be obtained prior to the start of work

  • The submitted construction drawings shall include, but not be limited to, the following:
    • Detail materials to be used.
    • Provide technical specifications of the system to be used.
    • For roof top installations, the construction drawings shall be signed and sealed by an Architect or Engineer licensed in the Commonwealth of Pennsylvania to approve the existing roof for the added dead loads.
  • Submit two (2) copies of the electrical wiring diagram approved by one of the Approved Electrical Underwriters attached to this Application. 